"Industrial Switching"

Click to enlarge
Industrial Switching © Emrys Hopkins

Using a threeway switch and a double slip helps squeeze as much as possible into this rather small space. There are spotting locations for 3 or 4 industries (depending on how you develop the buildings) and the track to the left of the plan can lead to a hidden staging area if space allows.

The opportunity is also there for the inside of the nearest building to be modelled, should you so desire.

We welcome your views on the plans published here - click on the 'leave a response' link below to join in on the discussions.

You can leave a response, or trackback from your own site.


What do you think? Add a comment